Know in a minute how the line is doing
Variables and profile measurements are seen together, by the minute, with their status and the production order's
For extrusion plants: the line's variables live, the profile dimension projected by a model and the suggested adjustment that a person applies before scrap is produced.
The line's variables were read on the machine panels and adjusted at each shift's discretion. A profile dimension out of tolerance was noticed only at quality control, when there was already scrap, and no record was left of what was changed or why on each production order.
The whole line is seen on one screen, profile deviation is anticipated with a suggested adjustment, and each production order is left with its events, adjustments, alerts and report, with a reference number and an owner.
PLC variables and profile measurements on one screen, with their status.
The model projects the dimension and suggests what to move; a person decides.
Events, adjustments, alerts and PDF report for each production order, with an owner.
Automatic writing exists behind three safeguards and is switched off today.
Variables and profile measurements are seen together, by the minute, with their status and the production order's
Out-of-range variables are separated automatically, with their trend and the rule that triggers the alert
A model per zone projects the dimension 15 minutes ahead and suggests which variable to move; a person decides
The alert goes out by WhatsApp to whoever covers the line and a record is kept of who handled it
The production order gathers its events, adjustments and alerts on its own; when closed, it is summarized and the PDF report is produced
The platform reads the PLC and proposes; writing to it has three safeguards, and today it is switched off
This project started with a profile extrusion plant that adjusted the line at each shift's discretion and found scrap at quality control.
Variables were read on the machine panels, adjustments depended on the experience of whoever was on shift and no record was left of what was changed in each production order. The profile dimension was checked afterward, when the material was already out of tolerance.
We walk you through the full system and review with you whether it applies to your process.