← Manufacturing & EngineeringContinuous improvement and finance

Savings from every plant in one system

Savings projects, budget versus actual, A3s and best practices in one common format for every plant.

What was solved

From manual operation to a system that runs it

Before

Savings projects, budgets and A3s lived in shared lists and spreadsheets, with a different month-end close at every plant. Reports were rebuilt before each meeting and actuals were checked by hand.

After

Every plant reports in the same format and up to date, and each saving counts only once it is validated and documented.

What the operation gains

  • A single register

    All projects from all plants, with the same fields and their evidence.

  • Reports without rebuilding

    Budget, forecast and actual up to date, with no files to assemble before the meeting.

  • Validated savings

    Each saving goes through validation and is kept with its A3.

  • Improvements that get replicated

    What works at one plant is matched against the capacity of the others.

How we solved it

The processes we tackled

A shop-floor idea, evaluated and turned into a project

Anyone submits an idea from their phone, the AI scores it, and the manager decides with a reference number and a reply

A shop-floor idea, evaluated and turned into a projectSteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01The idea comes infrom the floorwithout goingthrough a boss…02Each idea reachesthe manageralready scored03The AI onlyrecommends;whether the ideamoves forward…04Only an approvedidea becomes aprojectWhether each ideamoves forward oris discardedA shop-floor idea, evaluated and turned into a projectSteps the system runs in order and the decision that remains with the person.The system does itA person decides01The idea comes infrom the floorwithout goingthrough a boss…02Each idea reachesthe manageralready scored03The AI onlyrecommends;whether the ideamoves forward…Whether each ideamoves forward oris discarded04Only an approvedidea becomes aproject

Each project's saving, calculated and documented in its A3

The A3 lives alongside the project, the AI proposes the savings calculation and a person decides whether to include it

Each project's saving, calculated and documented in its A3Steps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01Only the owner or theirsuperior edits an A302Each saving is calculatedwith the same rule, fromwhat the team wrote03What counts is the savinga person acceptedReview the quantities,units and period of thecalculation before…Each project's saving, calculated and documented in its A3Steps the system runs in order and the decision that remains with the person.The system does itA person decides01Only the owner ortheir superioredits an A3Review thequantities, unitsand period of thecalculationbefore…02Each saving iscalculated withthe same rule,from what theteam wrote03What counts isthe saving aperson accepted

The month-end close, with every saving validated

The period closes on the same date for all plants; the manager validates each project and the Controller approves the plant

The month-end close, with every saving validatedSteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01All plants close on thesame day02The manager reviews thewhole plant together03The Controller receivesthe complete plant, notproject by projectThe manager validateseach figureThe month-end close, with every saving validatedSteps the system runs in order and the decision that remains with the person.The system does itA person decides01All plants closeon the same day02The managerreviews the wholeplant together03The Controllerreceives thecomplete plant,not project byprojectThe managervalidates eachfigure

Each meeting's report, assembled and sent automatically

Each meeting has its own template with the same indicators, and the report arrives by email on the scheduled date

Each meeting's report, assembled and sent automaticallySteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01Each meeting is builtwith the same indicators02Each meeting receives itsreport on its owncalendar and with itsown…03An active send never goesout without a recipientor to a misspelled…What is reported, to whomand how oftenEach meeting's report, assembled and sent automaticallySteps the system runs in order and the decision that remains with the person.The system does itA person decides01Each meeting isbuilt with thesame indicators02Each meetingreceives itsreport on its owncalendar and withits own…What is reported,to whom and howoften03An active sendnever goes outwithout arecipient or to amisspelled…

Each plant reports in its own language and currency

Language is no longer a barrier: each person works in their own language and currency, and everyone reads the same figures

Each plant reports in its own language and currencySteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01A project entered at oneplant is read in thelanguage of whoever…02All plants add up indollars and everyonereads in their owncurrency03The exchange rate is setby month and its sourceis recordedReview and, if needed,correct the translationof key textsEach plant reports in its own language and currencySteps the system runs in order and the decision that remains with the person.The system does itA person decides01A project enteredat one plant isread in thelanguage ofwhoever…Review and, ifneeded, correctthe translationof key texts02All plants add upin dollars andeveryone reads intheir owncurrency03The exchange rateis set by monthand its source isrecorded

Knowing which plant is deviating and which improvement can be repeated

The AI points out which plant to review and which improvement to replicate, and each answer comes with its source and its next action

Knowing which plant is deviating and which improvement can be repeatedSteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01The directorstarts the monthknowing whichdeviation toreview…02A plant at riskis flagged by afixed rule, notby intuition03Only what isalready provenand documented atits plant isproposed…04Each provenimprovement istracked plant byplant until it…Whether a plantis intervened andwhether animprovementapplies are…Knowing which plant is deviating and which improvement can be repeatedSteps the system runs in order and the decision that remains with the person.The system does itA person decides01The directorstarts the monthknowing whichdeviation toreview…02A plant at riskis flagged by afixed rule, notby intuition03Only what isalready provenand documented atits plant isproposed…Whether a plantis intervened andwhether animprovementapplies are…04Each provenimprovement istracked plant byplant until it…

An improvement replicated with a commitment, from the matrix to the project

The destination plant decides whether the improvement applies; if it does, it commits to a date, a saving and a machine, and the project is born pre-filled

An improvement replicated with a commitment, from the matrix to the projectSteps the system runs in order and the decision that remains with the person.The systemdoes itA persondecides01The plant thatreplicatesdecides02Saying yescommits a date, asaving and amachine03The replicationis born as aproject with whatis alreadyvalidated04The committedsaving is spreadby month from thedate the plant…The destinationplant's managerdecides whetherthe improvement…An improvement replicated with a commitment, from the matrix to the projectSteps the system runs in order and the decision that remains with the person.The system does itA person decides01The plant thatreplicatesdecides02Saying yescommits a date, asaving and amachine03The replicationis born as aproject with whatis alreadyvalidatedThe destinationplant's managerdecides whetherthe improvement…04The committedsaving is spreadby month from thedate the plant…
Why it exists

This project began with a multi-plant manufacturer that wanted to see all its savings in one place.

Each plant reported in its own file. To know how much had been saved, and whether it was real, versions had to be gathered and reconciled before every meeting.

Want to see it with your operation?

We walk you through the full system and review with you whether it applies to your process.